DKE Group took charge of supplying and installing a Maintenance Access Platform and Pipe Bridge for Snack Brands. Despite the challenging time constraints during the Christmas period, DKE Group rose to the occasion. With Snack Brands requiring swift completion within an unrealistic timeframe, the workshop operated tirelessly around the clock. The steelwork was efficiently installed on the existing roof within just one week, aligning perfectly with the Christmas shutdown period. This project highlights DKE Group’s dedication to meeting demanding deadlines and delivering exceptional results, even under pressure.
We specialise in solving engineering challenges of all varieties, backed by traditional customer service. Our expert team delivers customised solutions spanning specification and functional design, estimate and risk assessment, drafting, fabrication, installation, project management, decommission and relocation, repair and maintenance. Whatever you need, consider it done.
Sydney
9 Wenban Place,
Wetherill Park
NSW 2164
Brisbane
15-17 Prosperity Place,
Park Ridge
QLD 4125
© Copyright DARK KNIGHT ENGINEERING 2025 All rights reserved. | Website by Brilliant Digital.