Dark Knight Engineering completed a silo construction project for Austral Bricks, starting with welding cleats for cladding and progressing through roof installation, preparing the top section for insulation and cladding, and assembling the cascade and hood sections. The lower cascade and hoods were then insulated, clad, lifted onto the hopper section, and positioned. After placing the silo on top, we assembled and fitted the stack in stages, including twilight work on the top section. We tested the final stack, lifted and tied a fully clad duct into the kiln, and compared new and old structures. Finally, we constructed the stair tower, lifting both lower and upper sections into place to complete the project.
We specialise in solving engineering challenges of all varieties, backed by traditional customer service. Our expert team delivers customised solutions spanning specification and functional design, estimate and risk assessment, drafting, fabrication, installation, project management, decommission and relocation, repair and maintenance. Whatever you need, consider it done.
Sydney
9 Wenban Place,
Wetherill Park
NSW 2164
Brisbane
15-17 Prosperity Place,
Park Ridge
QLD 4125
© Copyright DARK KNIGHT ENGINEERING 2024 All rights reserved. | Website by Brilliant Digital.